Tritex Fencing during construcction (incomplete)
0233
Tritex fencing during construction (incomplete)
0234
Tritex fencing during initial construction and prior to full back fill.
0235
Tritex fencing during construction showing design overlap but before final joining of panels
0236
Fencing affected by severe flooding. This section was replaced to ensure quality.
0239
Tritex fencing on complete section.
0243
Tritex fencing showing ability to change direction.
0244
Section where a buried object had to be avoided.
0245
Tritex completed
0246
Fledgling Marsh Harriers on site. Photo by Chris Horgan.
0211001
Smooth Newts during fencing construction
0215005
0237023
Tritex fencing completed
0238024
Area where three land drains were constructed to allow water to move across site
0239025
One of three drains installed
0240026
Land drain number two
0242028
Drift Fencing
0243029
Tritex exclusion fencing
0245031
land drain number three
0244030
0247033
0249035
Completed join on uneven terrain
0251037
near heartbreak ridge
0253039
Heartbreak Ridge Image showing ability of TRITEX to cope with topography
0256042
Heartbreak Ridge
0257043
0274060
Gravid Female Common Lizard on site
0422110
Join between drift fence and exclusion fence
0280066
0281067
0282068
0285071
0289075
Join between exclusion fence
0293079
Exclusion fence
0295081
0296082
Join between drift fence and exclusion fences
0298084
0300086
0304090
Fence during construction
0307093
0313099
Pinch point
0314100
TRitex fencing in situ
0316102
0318104
Drift Fence construction
0320106
0321107
0322108
0323109